Planning application · SLK/P/26/0922
Up to 21 turbines and a BESS proposed at Ravengill Energy Park.
Ravengill Energy Park B797 From Abington A702 To Leadhills Leadhills Biggar
£1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Major 9/10
- Wind Turbine
Overview
Why it’s worth watching
This is a substantial Section 36 energy consultation with a distinctive turbine and battery specification. It is a useful national project lead, while its Registered status means no consent outcome should be implied.
- Proposed
- Up to 21 turbines, up to 220m high, and a BESS with an approximate capacity of 50MW.
- Stage
- Past its target date of 24 Sept 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is a Section 36 consultation about erecting up to 21 turbines, each up to 220m high, and building a battery energy storage system (BESS) with an approximate capacity of 50MW.
Written with AI from the application form and the council record.
Read our story
Two Ravengill cases list different turbine counts
A 2025 Ravengill scoping request described up to 32 turbines and 300MW. A separate Section 36 case lists up to 21 turbines with heights up to 220m and a battery facility of approximately 50MW; the records do not establish whether the newer entry supersedes the earlier one.
City Scope Journal →Keep reading
Official records · coverage in progress
1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.
Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SLK/P/26/0922?
Follow it on City Scope. This page is checked against the South Lanarkshire Council planning register and shows the latest status, decision and documents for SLK/P/26/0922. City Scope can email you when this application is decided. To comment on the application, use the South Lanarkshire Council planning portal.
Get an email when this application is decidedOn the street
What neighbours would notice.
- 01
Up to 21 turbines, each up to 220m high, are proposed.
- 02
A battery energy storage system (BESS) is proposed, with an approximate capacity of 50MW.
Tags
- Wind Turbine
What each tag is based on
- Wind Turbine
- ““erection of up to 21 turbines with a height up to 220m””
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received15 Jul 2026
- Validated24 Jul 2026The council has everything it needs.
- Comments closed14 Aug 2026Usual deadline. Late comments may still count.
- Target decision (next)24 Sept 20262-month target for local developments.
- DecisionNot yet
The record
- Reference
- SLK/P/26/0922
- Address
- Ravengill Energy Park B797 From Abington A702 To Leadhills Leadhills Biggar
- Status
- Registered
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- South Lanarkshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.