Planning applicationSLK/P/26/0922

Ravengill Energy Park B797 From Abington A702 To Leadhills Leadhills Biggar

RegisteredWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.

Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

15 July 2026

Validated

24 July 2026

Planning Signals

1 detected trait

Specific
Wind Turbine
AI summary

Up to 21 wind turbines (up to 220m) and a BESS battery storage facility (around 50MW) proposed under Section 36.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application SLK/P/26/0922

Ravengill Energy Park B797 From Abington A702 To Leadhills Leadhills Biggar

RegisteredRenewable Energy, EV & Heat PumpsReceived South Lanarkshire Council

Up to 21 wind turbines (up to 220m) and a BESS battery storage facility (around 50MW) proposed under Section 36.

Reference
SLK/P/26/0922
Address
Ravengill Energy Park B797 From Abington A702 To Leadhills Leadhills Biggar
Status
Registered
Category
Renewable Energy, EV & Heat Pumps
Impact scale
9/10
Authority
South Lanarkshire Council
Received
Validated
Last scraped
Record created
Latitude
55.4539
Longitude
-3.7454

Plain-language summary

Up to 21 wind turbines (up to 220m) and a BESS battery storage facility (around 50MW) proposed under Section 36.

As filed with the council

Section 36 Consultation relating to the erection of up to 21 turbines with a height up to 220m and construction of BESS facility with capacity of approximatelely 50MW.

City Scope Journal

Two Ravengill cases list different turbine counts

A 2025 Ravengill scoping request described up to 32 turbines and 300MW. A separate Section 36 case lists up to 21 turbines with heights up to 220m and a battery facility of approximately 50MW; the records do not establish whether the newer entry supersedes the earlier one.