Planning applicationSTG/25/00385/LBC

36 Park Terrace Kings Park Stirling FK8 2JS

DecidedRenewable Energy & Sustainability
Official records · coverage in progress

550 of 736 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 186 records from that period are still being added or checked.

Proposals and decisions come from Stirling Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

14 July 2025

Validated

17 July 2025

Planning Signals

2 detected traits

Context
Listed Building
Specific
Roof Mounted Solar Panels
AI summary

Roof-mounted solar panels and wall-mounted heat pumps proposed for 36 Park Terrace, Stirling, with equipment to sit flush/low-profile against the building.

Impact scale

Estimated scale of impact on the surrounding area.

3/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application STG/25/00385/LBC

36 Park Terrace Kings Park Stirling FK8 2JS

DecidedRenewable Energy, EV & Heat PumpsReceived Stirling Council

Roof-mounted solar panels and wall-mounted heat pumps proposed for 36 Park Terrace, Stirling, with equipment to sit flush/low-profile against the building.

Reference
STG/25/00385/LBC
Address
36 Park Terrace Kings Park Stirling FK8 2JS
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
3/10
Authority
Stirling Council
Received
Validated
Last scraped
Record created
Latitude
56.1114
Longitude
-3.9485

Plain-language summary

Roof-mounted solar panels and wall-mounted heat pumps proposed for 36 Park Terrace, Stirling, with equipment to sit flush/low-profile against the building.

As filed with the council

Roof mounted solar panels and wall mounted heat pumps