Planning applicationSTG/25/00530/LBC

11 Albert Place Kings Park Stirling FK8 2RE

DecidedRenewable Energy & Sustainability
Official records · coverage in progress

550 of 736 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 186 records from that period are still being added or checked.

Proposals and decisions come from Stirling Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

29 September 2025

Validated

29 September 2025

Planning Signals

2 detected traits

Context
Listed Building
Specific
Car Parking
AI summary

Plans for an on-site EV charging facility at 11 Albert Place, Stirling, with a charging point shown within the parking area.

Impact scale

Estimated scale of impact on the surrounding area.

3/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application STG/25/00530/LBC

11 Albert Place Kings Park Stirling FK8 2RE

DecidedRenewable Energy, EV & Heat PumpsReceived Stirling Council

Plans for an on-site EV charging facility at 11 Albert Place, Stirling, with a charging point shown within the parking area.

Reference
STG/25/00530/LBC
Address
11 Albert Place Kings Park Stirling FK8 2RE
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
3/10
Authority
Stirling Council
Received
Validated
Last scraped
Record created
Latitude
56.1181
Longitude
-3.9439

Plain-language summary

Plans for an on-site EV charging facility at 11 Albert Place, Stirling, with a charging point shown within the parking area.

As filed with the council

Proposed on-site facility for charging an electric vehicle