Planning applicationSTG/25/00568/FUL

The Auld Kirk Carronbridge FK6 5JJ

DecidedRenewable Energy & Sustainability
Official records · coverage in progress

550 of 736 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 186 records from that period are still being added or checked.

Proposals and decisions come from Stirling Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

16 October 2025

Validated

22 October 2025

Planning Signals

1 detected trait

Specific
Ancillary External Plant Pipework
AI summary

Proposed 914kW air source heat pump at the rear, placed behind a boundary wall between sheds, with underground connections to the building.

Impact scale

Estimated scale of impact on the surrounding area.

3/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application STG/25/00568/FUL

The Auld Kirk Carronbridge FK6 5JJ

DecidedRenewable Energy, EV & Heat PumpsReceived Stirling Council

Proposed 914kW air source heat pump at the rear, placed behind a boundary wall between sheds, with underground connections to the building.

Reference
STG/25/00568/FUL
Address
The Auld Kirk Carronbridge FK6 5JJ
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
3/10
Authority
Stirling Council
Received
Validated
Last scraped
Record created
Latitude
56.0432
Longitude
-4.0052

Plain-language summary

Proposed 914kW air source heat pump at the rear, placed behind a boundary wall between sheds, with underground connections to the building.

As filed with the council

Installation of an Air Source Heat Pump (ASHP, 9kW-14kW) at the rear