Planning applicationSTG/25/00570/LBC

The Auld Kirk Carronbridge FK6 5JJ

DecidedRenewable Energy & Sustainability
Official records · coverage in progress

550 of 736 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 186 records from that period are still being added or checked.

Proposals and decisions come from Stirling Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

22 October 2025

Validated

23 October 2025

Planning Signals

6 detected traits

Works
Internal Alterations
Context
Listed Building
Specific
Listed Building Consent ContextListed Building Internal ReshapingMinor Structural AlterationOpen Plan Kitchen Living
AI summary

Internal ground-floor wall removals to form open-plan kitchen/dining, supported by a steel beam, plus installation of a ground-mounted air source heat pump.

Impact scale

Estimated scale of impact on the surrounding area.

5/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application STG/25/00570/LBC

The Auld Kirk Carronbridge FK6 5JJ

DecidedRenewable Energy, EV & Heat PumpsReceived Stirling Council

Internal ground-floor wall removals to form open-plan kitchen/dining, supported by a steel beam, plus installation of a ground-mounted air source heat pump.

Reference
STG/25/00570/LBC
Address
The Auld Kirk Carronbridge FK6 5JJ
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
5/10
Authority
Stirling Council
Received
Validated
Last scraped
Record created
Latitude
56.0432
Longitude
-4.0052

Plain-language summary

Internal ground-floor wall removals to form open-plan kitchen/dining, supported by a steel beam, plus installation of a ground-mounted air source heat pump.

As filed with the council

Removal of partition walls (load-bearing and non-load-bearing) on the ground floor to create an open-plan kitchen and dining area, installation of a new steel universal beam to support the load-bearing section and installation of a ground-mounted Air Source Heat Pump (ASHP) unit