CityScope · Planning Updates
Application ABS/APP/2025/1107
Castle Of Auchry Farm Cuminestown Turriff AB53 5UR
Erection of three large 800kW wind turbines (up to 74m) with substation, tracks and hardstandings, and changes to turbine life condition.
The record
- Reference
- ABS/APP/2025/1107
- Address
- Castle Of Auchry Farm Cuminestown Turriff AB53 5UR
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Aberdeenshire Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 57.543926
- Longitude
- -2.358942
What is proposed
Plain-language summary
Erection of three large 800kW wind turbines (up to 74m) with substation, tracks and hardstandings, and changes to turbine life condition.
As filed with the council
Erection of Three 800kW Wind Turbines with Substation & Associated Tracks & Hardstandings, 3 x 74m Without Compliance with Condition 2 (Operational Life) of Planning Permission Reference APP/2010/0067