Planning application · ABS/ENQ/2025/1103
Upgrade proposed for Fetteresso substation.
Fetteresso Substation Fetteresso Stonehaven Aberdeenshire AB39 3UX
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Mechanical Plant, Flues & Ventilation
- Medium 5/10
- Ancillary Structure
- Associated Infrastructure
- Electrical Infrastructure
- Substation
- Switchgear Switching Equipment Enclosure
Overview
Why it’s worth watching
Submission ENQ/2025/1103 is a pre-application enquiry for the upgrade of the existing Fetteresso substation and installation of a combined GIS and control building with ancillary works, awaiting decision.
- Today
- An existing 132 kV substation.
- Proposed
- An upgraded substation, with a combined GIS and control building and associated works.
- Size
- 132 kV substation voltage
- Stage
- Decided on 6 Aug 2025: PAC Agreed as Specified in Notice.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application describes an upgrade to the existing 132 kV Fetteresso substation. It includes a combined gas-insulated switchgear (GIS) and control building, along with access, drainage, landscaping and other associated works. The recorded decision is “PAC Agreed as Specified in Notice”; the record does not say that planning permission has been granted.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/ENQ/2025/1103?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/ENQ/2025/1103. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A combined GIS and control building would be installed.
- 02
The works include means of access, site drainage and landscaping.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Ancillary Structure
- Associated Infrastructure
- Electrical Infrastructure
- Substation
- Switchgear Switching Equipment Enclosure
What each tag is based on
- Ancillary Structure
- “Control Building”
- Associated Infrastructure
- “Ancillary Works, Means Of Access, Site Drainage, Landscaping”
- Electrical Infrastructure
- “132 Kv Fetteresso Substation”
- Substation
- “Upgrade To The Existing 132 Kv Fetteresso Substation”
- Switchgear Switching Equipment Enclosure
- “Gas Insulated Switchgear (Gis)”
All documents (1)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 6 August 2025.
- Received1 Aug 2025
- Validated4 Aug 2025The council has everything it needs.
- Comments closed25 Aug 2025Usual deadline. Late comments may still count.
- Target decision4 Oct 20252-month target for local developments.
- Decision6 Aug 2025PAC Agreed as Specified in Notice.
Linked application
Planning terms
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- ABS/ENQ/2025/1103
- Address
- Fetteresso Substation Fetteresso Stonehaven Aberdeenshire AB39 3UX
- Status
- Decided
- Council decision
- PAC Agreed as Specified in Notice
- Decision issued
- Category
- Mechanical Plant, Flues & Ventilation
- Impact scale
- 5/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Mearns
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.