Planning applicationABS/ENQ/2026/0753

Land To East Of Upper Culphin Cornhill Banff

DecidedWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

1 May 2026

Validated

5 May 2026

Planning Signals

2 detected traits

Specific
Associated InfrastructureWind Turbine
AI summary

Replacement wind turbine proposed with 45m hub height and 68.5m total height, plus associated electrical and grid infrastructure.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/ENQ/2026/0753

Land To East Of Upper Culphin Cornhill Banff

DecidedRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Replacement wind turbine proposed with 45m hub height and 68.5m total height, plus associated electrical and grid infrastructure.

Reference
ABS/ENQ/2026/0753
Address
Land To East Of Upper Culphin Cornhill Banff
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
6/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.6185
Longitude
-2.6578

Plain-language summary

Replacement wind turbine proposed with 45m hub height and 68.5m total height, plus associated electrical and grid infrastructure.

As filed with the council

Erection of Replacement Wind Turbine (Hub Height 45 metres) Total Height 68.5 metres and Associated Infrastructure