Planning applicationABS/ENQ/2026/0802

Land To The South Of Alehouse Hillock Cairnie Huntly AB54 4UB

DecidedWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

13 May 2026

Validated

13 May 2026

Planning Signals

3 detected traits

Specific
Associated InfrastructureRenewable Energy InfrastructureSubstation
AI summary

Plans for a 150MW battery energy storage system with substation and associated grid infrastructure on land south of Alehouse Hillock, near Cairnie.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/ENQ/2026/0802

Land To The South Of Alehouse Hillock Cairnie Huntly AB54 4UB

DecidedRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Plans for a 150MW battery energy storage system with substation and associated grid infrastructure on land south of Alehouse Hillock, near Cairnie.

Reference
ABS/ENQ/2026/0802
Address
Land To The South Of Alehouse Hillock Cairnie Huntly AB54 4UB
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.4862
Longitude
-2.9116

Plain-language summary

Plans for a 150MW battery energy storage system with substation and associated grid infrastructure on land south of Alehouse Hillock, near Cairnie.

As filed with the council

Installation of Battery Energy Storage System (BESS) with and Installed Capacity of 150 Megawatt (MW), Substation and Associated Infrastructure