Planning application · ABS/ENQ/2026/0802
150 MW battery storage system proposed near Cairnie.
Land To The South Of Alehouse Hillock Cairnie Huntly AB54 4UB
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Associated Infrastructure
- Renewable Energy Infrastructure
- Substation
Overview
Why it’s worth watching
Proposed 150MW BESS with substation and associated infrastructure is a major energy infrastructure proposal with significant local and strategic implications.
- Proposed
- Battery energy storage system, substation and associated infrastructure
- Size
- 150 megawatts (MW) installed capacity
- Stage
- Decided on 8 Jun 2026: EIA Opinion Adopted.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application describes a battery energy storage system with an installed capacity of 150 megawatts, a substation and associated infrastructure on land south of Alehouse Hillock. The council adopted an Environmental Impact Assessment (EIA) screening opinion. This is a decision about whether an EIA is required, not a decision on planning permission.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/ENQ/2026/0802?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/ENQ/2026/0802. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertThe impact
What it involves.
Questions
What does the council’s decision mean?
The record says an EIA screening opinion was adopted. It does not state whether planning permission was granted.
Tags
- Associated Infrastructure
- Renewable Energy Infrastructure
- Substation
What each tag is based on
- Associated Infrastructure
- “and Associated Infrastructure”, “associated grid infrastructure”
- Renewable Energy Infrastructure
- “Battery Energy Storage System (BESS)”
- Substation
- “Substation”
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 8 June 2026.
- Received13 May 2026
- Validated13 May 2026The council has everything it needs.
- Comments closed3 Jun 2026Usual deadline. Late comments may still count.
- Target decision13 Jul 20262-month target for local developments.
- Decision8 Jun 2026EIA Opinion Adopted.
The record
- Reference
- ABS/ENQ/2026/0802
- Address
- Land To The South Of Alehouse Hillock Cairnie Huntly AB54 4UB
- Status
- Decided
- Council decision
- EIA Opinion Adopted
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Huntly, Strathbogie and Howe of Alford
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.