CityScope · Planning Updates
Application ABS/ENQ/2026/0802
Land To The South Of Alehouse Hillock Cairnie Huntly AB54 4UB
Plans for a 150MW battery energy storage system with substation and associated grid infrastructure on land south of Alehouse Hillock, near Cairnie.
The record
- Reference
- ABS/ENQ/2026/0802
- Address
- Land To The South Of Alehouse Hillock Cairnie Huntly AB54 4UB
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Aberdeenshire Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 57.4862
- Longitude
- -2.9116
What is proposed
Plain-language summary
Plans for a 150MW battery energy storage system with substation and associated grid infrastructure on land south of Alehouse Hillock, near Cairnie.
As filed with the council
Installation of Battery Energy Storage System (BESS) with and Installed Capacity of 150 Megawatt (MW), Substation and Associated Infrastructure
