Planning application · ABS/ENQ/2026/1460
Wind turbine with a total height of 79.6m proposed at East Leylodge Farm.
Site At East Leylodge Farm Kintore Aberdeenshire AB51 0XY
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Medium 6/10
- Associated Infrastructure
- Wind Turbine
Overview
- Proposed
- A wind turbine and associated infrastructure
- Size
- 55.6 m hub height · 79.6 m total height
- Stage
- Decided on 8 Sept 2026: EIA Opinion Adopted.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is for a wind turbine and associated infrastructure at East Leylodge Farm. The description gives a hub height of 55.6m and a total height of 79.6m. The council has adopted an Environmental Impact Assessment (EIA) opinion; this is not a decision on whether to grant planning permission.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/ENQ/2026/1460?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/ENQ/2026/1460. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A wind turbine is proposed at East Leylodge Farm, with a total height of 79.6m.
- 02
Associated infrastructure is also proposed; the description does not specify what it includes.
Questions
What does the council's EIA decision mean?
The council has adopted an EIA opinion. This record does not say whether planning permission has been granted.
Tags
- Associated Infrastructure
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “and Associated Infrastructure”
- Wind Turbine
- “Erection of Wind Turbine”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 8 September 2026.
- Received11 Aug 2026
- Validated11 Aug 2026The council has everything it needs.
- Comments closed1 Sept 2026Usual deadline. Late comments may still count.
- Target decision11 Oct 20262-month target for local developments.
- Decision8 Sept 2026EIA Opinion Adopted.
The record
- Reference
- ABS/ENQ/2026/1460
- Address
- Site At East Leylodge Farm Kintore Aberdeenshire AB51 0XY
- Status
- Decided
- Council decision
- EIA Opinion Adopted
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 6/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- East Garioch
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







