CityScope · Planning Updates
Application SHE/2025/301/ECUCON
Land To East Of Sullom Voe Oil Terminal Mossbank Shetland
Gatecheck 1 for Neshion Energy Park, proposing energy generation infrastructure on site.
The record
- Reference
- SHE/2025/301/ECUCON
- Address
- Land To East Of Sullom Voe Oil Terminal Mossbank Shetland
- Status
- Unknown
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Shetland Islands Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 60.4652
- Longitude
- -1.2387
What is proposed
Plain-language summary
Gatecheck 1 for Neshion Energy Park, proposing energy generation infrastructure on site.
As filed with the council
PROPOSED NESHION ENERGY PARK - Gatecheck 1