Application SLK/P/26/0324
Land 190M Northwest Of 3 Leadhills Road Leadhills Road Elvanfoot Biggar South Lanarkshire
Plans for a battery energy storage system (BESS) with associated grid and control infrastructure at the existing energy site.
The record
- Reference
- SLK/P/26/0324
- Address
- Land 190M Northwest Of 3 Leadhills Road Leadhills Road Elvanfoot Biggar South Lanarkshire
- Status
- Registered
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 6/10
- Authority
- South Lanarkshire Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 55.4395
- Longitude
- -3.6632
What is proposed
Plain-language summary
Plans for a battery energy storage system (BESS) with associated grid and control infrastructure at the existing energy site.
As filed with the council
Installation of a Battery Energy Storage System (BESS) facility and associated infrastructure