Planning applicationSLK/P/26/0324

Land 190M Northwest Of 3 Leadhills Road Leadhills Road Elvanfoot Biggar South Lanarkshire

RegisteredWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.

Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

12 March 2026

Validated

26 March 2026

Planning Signals

1 detected trait

Specific
Associated Infrastructure
Application Insights

No form insights available yet.

AI summary

Plans for a battery energy storage system (BESS) with associated grid and control infrastructure at the existing energy site.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application SLK/P/26/0324

Land 190M Northwest Of 3 Leadhills Road Leadhills Road Elvanfoot Biggar South Lanarkshire

RegisteredRenewable Energy, EV & Heat PumpsReceived South Lanarkshire Council

Plans for a battery energy storage system (BESS) with associated grid and control infrastructure at the existing energy site.

Reference
SLK/P/26/0324
Address
Land 190M Northwest Of 3 Leadhills Road Leadhills Road Elvanfoot Biggar South Lanarkshire
Status
Registered
Category
Renewable Energy, EV & Heat Pumps
Impact scale
6/10
Authority
South Lanarkshire Council
Received
Validated
Last scraped
Record created
Latitude
55.4395
Longitude
-3.6632

Plain-language summary

Plans for a battery energy storage system (BESS) with associated grid and control infrastructure at the existing energy site.

As filed with the council

Installation of a Battery Energy Storage System (BESS) facility and associated infrastructure