Planning applicationSTG/26/00138/LBC

Morrisons Cold Beer Company 84 Murray Place Stirling FK8 2BX

DecidedWorth watchingInternal Works & Accessibility
Official records · coverage in progress

550 of 736 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 186 records from that period are still being added or checked.

Proposals and decisions come from Stirling Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

17 March 2026

Validated

19 March 2026

Planning Signals

7 detected traits

Works
Windows & Doors
Context
Listed Building
Specific
External AlterationsListed Building Consent ContextNew PartitionPublic House
AI summary

Refurbishment for Cold Beer Co.: new internal wall, fixed seating and bar servery updates, sealed/blackened high-level windows, plus external frame/door painting.

Impact scale

Estimated scale of impact on the surrounding area.

4/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application STG/26/00138/LBC

Morrisons Cold Beer Company 84 Murray Place Stirling FK8 2BX

DecidedInternal Works & AccessibilityReceived Stirling Council

Refurbishment for Cold Beer Co.: new internal wall, fixed seating and bar servery updates, sealed/blackened high-level windows, plus external frame/door painting.

Reference
STG/26/00138/LBC
Address
Morrisons Cold Beer Company 84 Murray Place Stirling FK8 2BX
Status
Decided
Category
Internal Works & Accessibility
Impact scale
4/10
Authority
Stirling Council
Received
Validated
Last scraped
Record created
Latitude
56.1199
Longitude
-3.9374

Plain-language summary

Refurbishment for Cold Beer Co.: new internal wall, fixed seating and bar servery updates, sealed/blackened high-level windows, plus external frame/door painting.

As filed with the council

Internal works including refurbishment, decoration and joinery alterations, new wall between raised area and side entrance, new fixed seating and bar servery alterations, and existing high-level windows to be sealed up and blacked out ; External works are for decorations - paint the existing window frames in white and like for like staining of doors (main entrance and side doors on right hand side)