Planning applicationSTG/26/00311/LBC

Former Council Office 24 King Street Stirling FK8 1AY

Awaiting decisionWorth watchingInternal Works & Accessibility
Official records · coverage in progress

550 of 736 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 186 records from that period are still being added or checked.

Proposals and decisions come from Stirling Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

19 June 2026

Validated

26 June 2026

Planning Signals

14 detected traits

Works
Facade / ExteriorWindows & Doors
Context
Listed Building
Specific
Drainage Wastewater InfrastructureExternal AlterationsExternal Flue Installation
Application Insights

No form insights available yet.

AI summary

Hotel/restaurant/bar refurbishment: rainwater/roof repairs, new extract flue, reglazed windows and internal staircase, wall and ramp works.

Impact scale

Estimated scale of impact on the surrounding area.

5/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application STG/26/00311/LBC

Former Council Office 24 King Street Stirling FK8 1AY

Awaiting decisionInternal Works & AccessibilityReceived Stirling Council

Hotel/restaurant/bar refurbishment: rainwater/roof repairs, new extract flue, reglazed windows and internal staircase, wall and ramp works.

Reference
STG/26/00311/LBC
Address
Former Council Office 24 King Street Stirling FK8 1AY
Status
Awaiting decision
Category
Internal Works & Accessibility
Impact scale
5/10
Authority
Stirling Council
Received
Validated
Last scraped
Record created
Latitude
56.1182
Longitude
-3.9377

Plain-language summary

Hotel/restaurant/bar refurbishment: rainwater/roof repairs, new extract flue, reglazed windows and internal staircase, wall and ramp works.

As filed with the council

Internal and external alterations associated with the proposed operation as a Hotel, Restaurant and Bar. External alterations include: replacement of slates, cracked sections of rainwater pipes and UPVC section of rainwater pipe; relaying loose stonework; cleaning of biological build up on external cornicing; repairs to front doors and stone balusters; reinstatement of metalwork at windows above front doors; stripping out of lead wall head gutter and replacement; formation of new gutter and rainwater hoppers; removal of redundant vent pipes; new extract flue; insertion of new false door; and, reglaze 5nos. rear windows with double glazing. Internal alterations include: downtaking staircase; removal of parts of walls; insertion of new walls, staircase, ceiling, ceiling rose, doors, ramp and secondary glazing to front windows; reinstatement of woodwork around windows; infill of openings; adjustment of floor level; repair of ceiling, cornicing and rooflight; replacement of external rear door; and, formation of new loft hatch