Planning application · STG/26/00444/FUL
Up to 4 wind turbines proposed at Cairnoch Hill.
Land At Cairnoch Hill Carronbridge
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Major 9/10
- Associated Infrastructure
- Wind Turbine
- Wind Turbine Count 5
Overview
Why it’s worth watching
Up to four 180-metre turbines with associated infrastructure is a large renewable energy proposal with clear landscape and local consequence.
- Proposed
- Up to 4 wind turbines and associated infrastructure
- Size
- 180 metres maximum overall height
- Stage
- Past its target date of 27 Oct 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes installing and operating up to 4 wind turbines, each within a maximum overall height of 180 metres. It also includes associated infrastructure.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
550 of 736 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 186 records from that period are still being added or checked.
Proposals and decisions come from Stirling Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application STG/26/00444/FUL?
Follow it on City Scope. This page is checked against the Stirling Council planning register and shows the latest status, decision and documents for STG/26/00444/FUL. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Stirling Council planning portal.
On the street
What neighbours would notice.
- 01
Up to 4 wind turbines, up to a maximum overall height of 180 metres, are proposed.
- 02
Associated infrastructure is proposed; the description does not specify what it includes.
Tags
- Associated Infrastructure
- Wind Turbine
- Wind Turbine Count 5
What each tag is based on
- Associated Infrastructure
- “and associated infrastructure”
- Wind Turbine
- “Install and operate up to 4no. wind turbines”
- Wind Turbine Count 5
- “up to 4no. wind turbines”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received24 Aug 2026
- Validated27 Aug 2026The council has everything it needs.
- Comments closed17 Sept 2026Usual deadline. Late comments may still count.
- Target decision (next)27 Oct 20262-month target for local developments.
- DecisionNot yet
Linked application
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
The record
- Reference
- STG/26/00444/FUL
- Address
- Land At Cairnoch Hill Carronbridge
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- Stirling Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.