Skip to content

Planning application · STG/26/00444/FUL

STG/26/00444/FULAwaiting decisionWorth watching

Up to 4 wind turbines proposed at Cairnoch Hill.

Land At Cairnoch Hill Carronbridge

Stirling Council

Free with a City Scope account. One email, when the council decides.

Also email me new applications nearby · £1 a month for one alert. Cancel any time.

Preview alerts near your postcode
Category
Renewable Energy, EV & Heat Pumps
Scale
Major 9/10
Tags
  • Associated Infrastructure
  • Wind Turbine
  • Wind Turbine Count 5

Overview

Why it’s worth watching

Up to four 180-metre turbines with associated infrastructure is a large renewable energy proposal with clear landscape and local consequence.

Proposed
Up to 4 wind turbines and associated infrastructure
Size
180 metres maximum overall height
Stage
Past its target date of 27 Oct 2026.

The council writes only to properties within 20 metres of an application site. Who is told

In plain English

The application proposes installing and operating up to 4 wind turbines, each within a maximum overall height of 180 metres. It also includes associated infrastructure.

Written with AI from the application form and the council record.

Keep reading

Official records · coverage in progress

550 of 736 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 186 records from that period are still being added or checked.

Proposals and decisions come from Stirling Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register

Track this application

How do I track planning application STG/26/00444/FUL?

Follow it on City Scope. This page is checked against the Stirling Council planning register and shows the latest status, decision and documents for STG/26/00444/FUL. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Stirling Council planning portal.