Every data centre planning application we track across Scotland's councils, from the first notice of a scheme to the council's decision, with each site on the map.

Sites
24
Filings
46
Pending
12
Stated capacity
5,467 MW
Updated
20 Nov 2026

Email me new data centre filingsOne free alert for every new notice, application and decision across Scotland.

Sites, latest activity first24 sites

  1. PendingPlanning application300 MW

    ApaturaEast Dunbartonshire

    Proposed data centre campus with 300MW utility capacity, ancillary battery storage, parking, landscaping, roads and access.

    1. TP/ED/26/0627PendingPlanning application · 10 Nov 2026
    2. TP/ED/25/0428DecidedEarly notice · 26 Aug 2025
    3. TP/ED/25/0245PendingEarly notice · 29 Apr 2025

    Capacity: demand capacity in the filings, source

  2. PendingEarly notice225 MW

    Sunlaws Development Company (Roxburghe Estate)Scottish Borders

    Proposed data centre development with associated infrastructure.

    1. 26/01660/PANPendingEarly notice · 3 Nov 2026
    2. 26/01031/SCODecidedEarly notice · 8 Jul 2026
    3. 26/00809/PANDecidedEarly notice · 25 May 2026
    4. 25/01835/SCRDecidedEarly notice · 11 Dec 2025

    Capacity: three buildings of 75MW, source

  3. PendingPlanning application1,000 MW

    CX TechDumfries and Galloway

    Proposed data centre, training centre, industrial buildings, substation and associated infrastructure.

    1. 26/1649/PIPPendingPlanning application · 28 Sept 2026
    2. 26/0855/PANDecidedEarly notice · 11 May 2026
    3. 26/0464/SCODecidedEarly notice · 25 Mar 2026

    Capacity: developer figure (about 8 buildings of 120MW), not stated in the planning documents, source

  4. PendingPlanning application100 MW

    DataVita (HFD Group)North Lanarkshire

    Proposed green data centre development with buildings, access, landscaping, drainage, and infrastructure.

    1. 26/01110/PPPPendingPlanning application · 3 Sept 2026
    2. 26/00707/EIASCRDecidedEarly notice · 4 Jun 2026
    3. 25/01322/PANPendingEarly notice · 17 Dec 2025

    Capacity: about 100–124MW in the outline application, source

  5. PendingPlanning application150 MW

    Slate Island DevelopmentsInverclyde

    Planning permission in principle for a data centre with associated road access, parking, landscaping, and drainage.

    1. 26/0136/ICPendingPlanning application · 26 Aug 2026

    Capacity: up to 150MW, from the consultation report rather than the application, source

  6. PendingPlanning application300 MW

    ApaturaFalkirk

    Proposed AI data centre at Glenbervie Business Centre, with major site works for parking, landscaping, roads and new access, plus 300MW utility capacity.

    1. P/26/0237/FULPendingPlanning application · 4 Jun 2026

    Capacity: demand capacity in the application, source

  7. WithdrawnEarly notice400 MW

    ILI GroupNorth Lanarkshire

    Proposed data centre campus with a grid connection.

    1. 26/00595/EIASCRWithdrawnEarly notice · 3 Jun 2026
    2. 25/00989/PANPendingEarly notice · 18 Sept 2025

    Capacity: developer figure; one APRS map splits it as 200MW data centre and 200MW battery storage, source

  8. PendingPlanning application600 MW

    ILI GroupFife

    In-principle plan for a Class 6 data centre campus with data halls, gatehouses, substations, access roads, parking, drainage, fencing and landscaping.

    1. 26/01243/PPPPendingPlanning application · 21 May 2026
    2. 25/03079/SCRDecidedEarly notice · 10 Nov 2025
    3. 25/00552/PANDecidedEarly notice · 21 Feb 2025

    Capacity: up to 600MW, phased, developer figure, source

  9. PendingEarly notice

    Hunterston Data Centre Ltd (Eneus Energy)North Ayrshire

    EIA scoping opinion requested for a proposed new data centre.

    1. 26/00138/EIAPendingEarly notice · 27 Feb 2026

  10. DecidedPlanning application

    East Lothian

    Retrospective AI/data processing building at Dunbar landfill, with access, parking and welfare areas.

    1. 25/01412/PDecidedPlanning application · 3 Feb 2026

  11. DecidedEarly notice

    Ashfield LandFife

    Pitreavie Business Park: redevelopment involving demolition of existing buildings and new mixed-use commercial/industrial units, trade counters and a digital facility with parking and landscaping.

    1. 26/00336/PANDecidedEarly notice · 3 Feb 2026

  12. PendingEarly notice500 MW

    ApaturaNorth Lanarkshire

    Proposed Digital And Manufacturing Campus (Classes 4, 5, 6, And 10) Including Data Centres, Gigafactory, Research, Offices, Electricity Infrastructure, Ancillary Services (Classes 1 And 3 Including Sui Generis) With Access And Roads, Car Parking, Landscaping And Associated Development And Engineering Operations

    1. 26/00069/PANPendingEarly notice · 19 Jan 2026
    2. 24/01025/PANPendingEarly notice · 9 Oct 2024

    Capacity: grid connection applied for, source

  13. DecidedPlanning application

    University of St AndrewsFife

    Erect a digital infrastructure building with plant, plus boundary fencing and new hardstanding at University of St Andrews Eden Campus.

    1. 25/03299/FULLDecidedPlanning application · 14 Jan 2026

  14. PendingEarly notice

    HFD Renewables NL (DataVita)North Lanarkshire

    Plans for new data centre with flexible industrial/commercial buildings, plus substation, battery storage, utilities, access and landscaping on open land.

    1. 25/01328/PANPendingEarly notice · 8 Jan 2026

  15. DecidedEarly notice200 MW

    ApaturaCity of Edinburgh

    EIA screening sought for a multi-block data-centre campus with large footprints, cooling plant, 1300+ parking bays and landscaped buffer zones. .

    1. 25/05576/SCRDecidedEarly notice · 19 Dec 2025
    2. 25/03978/PANDecidedEarly notice · 1 Aug 2025
    3. 25/02924/SCRDecidedEarly notice · 5 Jun 2025

    Capacity: demand capacity in the proposal notice, source

  16. ApprovedPlanning application40 MW

    DataVita (HFD Group)North Lanarkshire

    Proposed data centre with associated plant plus new access and parking, updating facilities on the industrial estate.

    1. 25/01159/PPPApprovedPlanning application · 10 Nov 2025
    2. 25/00150/FULApprovedPlanning application · 25 Feb 2025
    3. 26/00803/MSCPendingFollow-up · 6 Jul 2026
    4. 26/00350/MSCApprovedFollow-up · 26 Mar 2026
    5. 26/00214/MSCApprovedFollow-up · 3 Mar 2026
    6. 25/01294/S42ApprovedFollow-up · 12 Dec 2025

    Capacity: about 40MW: the DV1 extension and the new DV3 building; published figures differ, source

  17. DecidedEarly notice540 MW

    ILI GroupEast Ayrshire

    Proposed data centre complex with new data halls, substation and access road, plus balancing pond, security and landscaping with wildflower meadow.

    1. 25/0008/PREAPPDecidedEarly notice · 10 Nov 2025

    Capacity: developer figure, source

  18. PendingPlanning application212 MW

    Shelborn DrummondCity of Edinburgh

    Major Edinburgh Park scheme could deliver a green data centre plus parkland, sports pitches, new cycle/foot links, parking and upgraded vehicle access. .

    1. 25/04239/SCRDecidedEarly notice · 29 Oct 2025
    2. 25/04239/PPPRefusedPlanning application · 8 Sept 2025
    3. 25/03575/SCRDecidedEarly notice · 9 Jul 2025
    4. 25/01968/PANDecidedEarly notice · 11 Apr 2025
    5. 26/02851/FULApprovedFollow-up · 7 Jul 2026

    Capacity: 212.42MW in the application, source

  19. DecidedEarly notice

    Thistle Sands DataEast Lothian

    Large new data centre with a community renewable heat hub, likely bringing major built development to the Dunbar site.

    1. 25/00008/SCRDecidedEarly notice · 7 Oct 2025

  20. DecidedEarly notice250 MW

    ApaturaWest Lothian

    Proposal of application notice for an AI Data Centre Campus with 250 MW utility capacity, ancillary BESS, parking, landscaping, roads and access.

    1. 0625/PAC/25DecidedEarly notice · 8 Aug 2025
    2. 0346/EIA/25DecidedEarly notice · 2 May 2025

    Capacity: stated in the proposal notice, source

  21. PendingEarly notice550 MW

    ApaturaNorth Lanarkshire

    AI data centre campus proposed with major power demand, battery storage, plus new access roads, parking and landscaping works.

    1. 25/00838/PANPendingEarly notice · 31 Jul 2025
    2. 25/00744/EIASCRDecidedEarly notice · 10 Jul 2025
    3. 25/00556/EIASCRDecidedEarly notice · 10 Jun 2025

    Capacity: demand capacity in the proposal notice, split across two parcels, source

  22. DecidedEarly notice200 MW

    ApaturaEast Ayrshire

    Request for an EIA screening opinion on a proposed data centre campus development.

    1. 25/0003/EIASCRDecidedEarly notice · 3 Jun 2025

    Capacity: developer figure, source

  23. DecidedEarly notice

    ApaturaSouth Lanarkshire

    Proposed data centre campus with ancillary offices, plant, backup generators, fuel storage, BESS, roads, parking, landscaping, fencing, lighting and substation.

    1. P/25/0490DecidedEarly notice · 13 May 2025

  24. DecidedEarly notice300 MW

    ApaturaScottish Borders

    Proposed erection of a data centre campus.

    1. 25/00556/SCRDecidedEarly notice · 7 May 2025

    Capacity: developer figure; a 500MW battery store is planned alongside, source

How this tracker works

City Scope reads planning applications from all 32 Scottish councils; 13 of them have data centre filings. An application appears here when its description names a data centre, data hall or server farm, or when our AI tagging marks it as data centre infrastructure. Mentions that only place something next to an existing data centre are left out.

Sites gather every filing for one scheme: an early notice such as a proposal of application notice or an environmental impact screening request, the planning application, and later follow-ups such as conditions, amendments and plant. We check each site by hand, naming the scheme and its developer and adding filings our council records do not hold yet; those link to the council.

Our Scottish records are fullest from mid-2025, and we are adding earlier filings. Schemes announced without a planning filing, such as Blackdog near Aberdeen and the former Cockenzie power station, appear once a notice is lodged.

Capacity and locations

Stated capacity adds up one figure per site: the developer's or the filing's headline megawatts, which is usually the grid demand the site asks for. Refused and withdrawn schemes are left out, and several sites have not published a figure, so the real total is higher.

Checked sites sit at the middle of the boundary filed with the council. Other pins use the council's own site location, or the centre of the postcode where that is all a council publishes. Follow planning updates or the planning map for every other application.

Loading map…
  • Early notice
  • Planning application
  • Follow-up